Offshore operation showing tool deployment into the sea to mill out a malfunctioning lubricator valve during a well intervention in Malaysia.

On-Demand Webinar: Milling Solutions

Discover how Welltec’s rigless tools enable efficient scale, plug, and hardware removal in well interventions.

Proven Milling Solutions for Efficient Well Intervention

Gain insights into proven milling solutions for well intervention.

This on-demand session explores how Welltec’s rigless, mechanical tools deliver efficient solutions for milling operations in plug and abandonment (P&A), well remediation, and scale removal.

Presented by Houssam Mourani, Vice President and Chief Commercial Officer at Welltec, the webinar highlights tool combinations, field applications, and case results that demonstrate performance, precision, and versatility, without the need for a rig.


Webinar Agenda:

  • Introduction to Welltec
  • Overview of intervention technologies
  • Milling combinations and configurations
  • Applications: scale, cement, resin, and plug removal
  • Bailing tools for debris recovery and cleaning
  • Three real-world case stories
  • Key technical learnings and supporting SPE paper
  • Summary: operational benefits, emissions reduction, and technology leadership

This session is ideal for professionals working in well completions, integrity management, and production operations who are looking to improve efficiency and reduce rig dependency.

Sign up for Webinar Access

To access the full webinar, please complete the sign-up form below. Once your registration is submitted and requirements are verified, you will receive an email with a direct link to view the session.

Contact a relevant expert

Houssam Mourani (1)
Houssam Mourani
Vice President WIS Sales

Restoring Well Access with E-Line Milling: SPE-Supported Case Study

The SPE paper “E-line Milling of Isolation Valve Restores Well Access in the North Sea” (SPE-209533-MS) supports the webinar by detailing a real-world milling intervention where a failed isolation valve restricted access in a horizontal producer well.

Using a tractor-conveyed e-line milling tool, the operation successfully milled through the valve in just 8.5 hours—restoring access and delivering significant time and cost savings. The case highlights how precision e-line milling can effectively resolve downhole hardware failures without the need for rig-based intervention.