Wireline-deployed metal expandable packer for well integrity
The Welltec® Delta Xpander combined with a Welltec Annular Barrier (WDX-WAB) delivers a novel wireline-enabled method for well integrity management, with the ability to deploy and activate multiple metal expandable packers in scenarios where conventional pressure-based activation is not feasible.
The WDX-WAB uses a downhole pump and valve-controlled sequence to enable precise, individual expansion of each metal expandable packer. This method allows for multiple WABs to be run in hole and expanded in place or positioned for future activation.
By decoupling deployment from pressure-based activation, the WDX-WAB unlocks new flexibility in completion design and contingency planning. The result is a highly flexible, wireline-deployed solution for remediation and proactive well integrity management.
Challenges and applications
Benefits
The WDX-WAB is delivered on an integrated wireline toolstring, combining all components needed for deployment and expansion.
Once run in hole, each WAB can be positioned to isolate a zone immediately or left for later expansion, depending on operational needs. This is particularly valuable where conventional pressure-based activation is not feasible.
Expansion is performed hydraulically using well fluid, delivered by the downhole pump in a controlled sequence. Each packer typically takes around 60 minutes to set and is fully monitored in real time via Surface Read Out (SRO) data for setting pressure, downhole pressure, and temperature. A fail-safe shear pin release provides redundancy in the unlikely event of pump malfunction or communication loss.
The result is a wireline-deployed, pressure-independent solution enabling precise, selective expansion of multiple WABs, whether for immediate isolation, staged zonal remediation, or proactive placement for future intervention.
Applications |
Low-pressure or leaky completions where standard WABs cannot be pressurized |
Redundant or delayed WAB activation |
Uncertain or changing downhole conditions |
Features |
Valve-controlled setting sequence |
Well fluid–driven expansion pressure |
Real-time temperature and pressure monitoring |
NACE compliant |
Compatible with other Welltec tools |
Benefits |
Cost-effective deployment without the need for coiled tubing or workover rigs. |
Multiple setting in a single run |
Durable packers withstand multiple pressure cycles |
Selective WAB activation |
On-field reconfiguration available to match actual tally |
Specifications* | |
Tool OD | 3 3/8” |
Minimum well ID | 3,5” |
Maximum setting ID | 3,9” |
Max activation pressure | 9000psi |
Max WAB setting pressure | 7000psi |
Max well temperature | 300°F |
Max well pressure | 25000psi |
Tension rating | 42000 lbs |
Length* | 40ft |
Weight (Min)* | 640lbs |
Expansion fluid | Well fluid (except mud) |
Talk to your local expert
At Welltec, our team of specialists is experienced in resolving the unique challenges of well drilling and operations across diverse terrain. Whatever your need, we can help you find a solution.