Scalable solutions for direct-use systems and high-output geothermal wells
Welltec® provides tailored solutions for geothermal well completions operating across a wide thermal range, from low-temperature direct-use systems to high-temperature resources.
At the extreme/top end of the scale/When demands are extreme, the Welltec® Magma Packer (WMP) is the only all-metal expandable packer on the market qualified to withstand extreme geothermal conditions above 330°C, delivering long-term annular integrity against the most demanding conditions.
Furthermore, our broad portfolio of completion solutions – including the Welltec® Annular Barrier (WAB®), and the Welltec® Light Packer (WLP) – is designed to provide zonal isolation, cement assurance, and reservoir compartmentalization, across the operating temperature range of geothermal wells.
Evolved from this industry-leading range of metal expandable packer solutions, the Welltec Expandable Anchor represents the only all-metal liner hanger system available, engineered for high load-bearing capacity, and thermal resilience.
Welltec® Flow Valves (WFV™) complete a flow control system for large bores with no internal restrictions, providing effective injection/production control in geothermal wells.
Through a range of proven metal expandable packer solutions, Welltec delivers fullbore completions capable of withstanding acidic corrosion and extreme pressure/temperature swings/cycling associated with the geothermal environment.
Built on decades of expertise in high-performance completions, our geothermal portfolio empowers operators to tackle the full thermal spectrum with confidence. Each solution is engineered for flexibility – delivering zonal isolation, cement assurance, flow control, and conformance in even the most extreme conditions.
Whether mitigating formation risk, extending well life, or revitalizing damaged assets, Welltec® enables smarter geothermal completion designs that reduce complexity, boost integrity, and support long-term, lower-emission energy production.
Our broad portfolio of intervention solutions supports efficient scale removal and cleanout in mid- to low-temperature wells (up to 150°C), as well as quenched high-temperature wells – all with minimal environmental impact through e-line deployment. With over 30 years of experience in scale removal from oil and gas wells, Welltec® brings proven expertise to geothermal operations, restoring flow and optimizing production.
Silica and calcite buildup is a common challenge in geothermal wells, driven by reservoir variability and thermodynamic shifts over time. E-line conveyed technologies like the Well Miller® offer a rigless, low-footprint alternative using a truck-mounted winch and crane – ideal even for interventions in urban environments.
High-temperature power generation
Low-temperature direct use
Minimizing environment impact
We believe in a fair and inclusive energy transition.
That is why we are applying our deep industry knowledge in new energy solutions to prepare for how we can produce more sustainable energy in the future.